Persian Gulf Water
Supply & Transmission

Project Details

Location
Bandar Abbas
End-User
Hormozgan REC
Owner
WASCO
MC
Yekom Consulting Co.
Consultant
Toossab Consulting Co.
Moniran Consulting Co.
Awarded
Sep, 2017

This Substation and Transmission Lines has been Constructed in Order to Power Up Water Sweetening Facilities for WASCO Water Transmission Project.

We have been selected as the EPC contractor of constriction of substation and transmission line.

This project will solve shortage of water in Bandar Abbas City and also solve the problem of Water shortage of Copper and mining factories in KERMAN province with 300kV water transmission Line.

  • 230/63kV GIS Substation Latidan
  • 3×250MVA Power Transformer
  • 6 Bay 230kV
  • 17 Bay 63kV
  • 8km 230kV Transmission Line
  • 10km 63kV Transmission Line
  • Control System: DCS