This Substation and Transmission Lines has been Constructed in Order to Power Up Water Sweetening Facilities for WASCO Water Transmission Project.
We have been selected as the EPC contractor of constriction of substation and transmission line.
This project will solve shortage of water in Bandar Abbas City and also solve the problem of Water shortage of Copper and mining factories in KERMAN province with 300kV water transmission Line.