SSCO has been selected as the EPC Contractor for Construction of 3 x 230kV AIS Substation in order to power up the Yadavan, Noth Azadegan and South Azadegan Oil Field Facilities.
Yadavarn 230kV/11kV AIS Substation Including:
- 4 x Power Transformer 230/11kV, 60MVA
- 9 x Feeder 230kV
- 24 x Feeder 11kV, 50kA
- Control System: DCS
- Location: Ahwaz, Khuzestan
North Azadegan 230/11kV AIS Substation Including:
- 2 x Power Transformer 230/11kV, 60MVA
- 5 x Feeder 230kV
- 12 x Feeder 11kV, 50kA
- Control System: DCS
- Location: Hoveyzeh, Khuzestan
South Azadegan 230/33kV AIS Substation Including:
- 2 x Power Transformer 230/33kV, 80MVA
- 5 x Feeder 230kV
- 11 x Feeder 33kV
- Control System: DCS
- Location: Talayieh, Khuzestan